• Telefone  - Betta Hidroturbinas
  • + 55 (16) 2104 5522
  • WhatsApp - Betta Hidroturbinas
  • +55 (16) 99977-0660
  • EN

INSTALLATION

read below the more frequent doubts about this theme.
did not find the answer? please contact us.

WITH INCREASE IN THE LENGTH OF THE HYDRAULIC POWER TURNING TUBE, CAN I GAIN FORCE?

Increasing the length of the turbine feed tube will only bring benefits when you can increase water fall. By increasing the length of the tube without increasing the water drop, we also increase the pressure drop of the tube, causing loss in the liquid drop. (net drop = gross loss - pipe losses).

Was this information helpful to you? Positivo Negativo

IN MY PROPERTY I DO NOT HAVE A FALL OF NATURAL WATER (WATERFALL). CAN I INSTALL A TURBO RODA, TURBO BOMBA BETTA OR A BETTA HYDROELECTRIC POWER GENERATOR?

We consider as the water fall the difference in level, measured vertically, between the water mirror (at the water pick-up point to drive the equipment) to the base of the same.

Thus, it is not mandatory to have a free water (waterfall) for installation of equipment and can be installed a tube following the natural slope of the land, achieving the fall of water required for drive the equipment

Was this information helpful to you? Positivo Negativo

DO I NEED SPECIALIZED WORK FOR INSTALLATION?

The necessary civil works for the installation is very simple and the plants are provided by Betta, allowing even a professional who has never installed a Turbo Roda Betta, Turbobomba Betta or a Betta Hydroelectric Generator do it without difficulty. We also have partners and resales all over Brazil, with teams trained to install these equipments.

Was this information helpful to you? Positivo Negativo

MY GROUND IS VERY FLAT AND I WILL NEED A VERY LARGE TUBE LENGTH TO GET THE MINIMUM WATER FALL NEEDED FOR THE SET. WHAT SHOULD I DO?

In this case, it is advisable to construct a lateral canal to the creek, as follows: At the highest point of the creek, divert a level channel (water slide) on the side of the terrain, distancing it from the natural course of the river (see scheme on the website). In this way, we will be creating a level difference between the channel and the natural course of the creek. After a few meters of canal, build a water catchment box and channel the water to the lowest possible point, where the settling base of equipment will be built.

Was this information helpful to you? Positivo Negativo

Utilizamos cookies para melhorar sua experiência. Saiba mais em nossa Política de Privacidade.

Falar com a Betta Hidroturbinas